Withers Road, Rouse Hill
Design and Construct project consisting of 66 Light Industrial Units with car parking, loading areas, associated landscaping and external works for this local client.
May St Bridge, Goulburn
A large-scale industrial project designed and delivered with precision, ensuring operational efficiency and long-term durability.
Banksmeadow
Construction consists of 7 bespoke heavy industrial units / warehouses with individual office space and a 1400m2 whiskey distillery that includes a 3-level office space, services and infrastructure and parking.
Marsden Park Project
Complete industrial development delivered through expert management, seamless coordination, and quality execution.
Courtyard & Carpark
This project improved the amenities and usable outdoor green and carpark space between Buildings N & O at the Kingswood campus.
Liverpool
SD Group worked with our client to deliver this amazing addition to the existing building that has assisted with reducing access issues for workers in the building.
Thirlmere
SD Group worked with our client to deliver this amazing addition to the existing building that has assisted with reducing access issues for workers in the building.
Money Close – 22 Industrial Units and 1 Retail Unit
Design and Construct 22 industrial units with mezzanine office space and 1 retail Café unit.
Charmhaven Industrial Units
Design and Construct 14 industrial units, total area 5,000m2, built in joinery, portable frame with precast panel, mezzanines office and landscaping.
Homebush Industrial Complex
Construction of 206 Industrial Units over a site area of 34,000 m2 providing 20,000m2 of business space. The project also includes a Café and a basement car park.
Bonar Street
Stormwater infrastructure upgrade for Bayside Council to reduce the impact and risk of flooding from increased density of housing in the local area.
Noise Wall Menai
Construction of 318m of Concrete Noise Wall along Alfords Point Rd that has improved the quality of life for residents by reducing noise and visual impacts from vehicular traffic.
Wentworthville - Hart Drive Noise Wall
Construction of a 334m pre-cast panel noise wall designed to enhance the amenity of the local community along Hart Drive.
Fairford Road Noise Wall
This project consisted of 495m of precast panel noise wall was designed and constructed to provide noise mitigation to local residents whilst appearing as an extension of the local road environment.
Winston Hills
This project consisted of 495m of precast panel noise wall was designed and constructed to provide noise mitigation to local residents whilst appearing as an extension of the local road environment.
Riverstone
Our client required a new vibrant office location with storage/warehousing facilities along with additional light industrial/commercial units for sale or lease.
Seven Hills
Our client needed a new warehouse and head office location. SD Group constructed a building that incorporated the required warehousing area with storage and loading dock facilities and a high quality office space.
Hillsdale – Stage 1: Banksmeadow
12 high quality light industrial factory / storage units with incorporated 1st floor office spaces finished with a bold design that highlights the interior and exterior of the buildings.
Hillsdale – Stage2: Banksmeadow
2 x Individual Office and Storage Warehouses with one unit incorporating a refrigerated and climate controlled seafood storage facility in the design and build.
Mulgrave - 18 Light Industrial Factory Units
A design & construct project consisting of 18 large boutique light industrial factory units with quality finishes.
Mt Kuringai
This was a design & construct project that resulted in the client utilising the maximum capacity of this sloping site for 17 quality light industrial factory units.
Intersection Upgrade
Nine intersection traffic improvement upgrades along Pittwater Rd to improve traffic flow and reduce congestion for commuters as a result of the B-Line express bus program.
Bus Lane Resurfacing
SD Group assisted TfNSW in applying a durable epoxy and bus-lane specific gravel using jet engine technology from the USA to heat the road surface to ensure the correct curing of the product.
Bus Lane Resurfacing
SD GROUP was engaged to undertake bus lane resurfacing. Our client is a regular provider for the TfNSW and had very specific guidelines for these works. Bus lane resurfacing is a regular requirement and managed by reliable contractors that can complete these within specific time and safety requirements. Road closure, cleaning and re-opening as per road occupation permits need to be strictly adhered to and thus can only be done by a select few. SD GROUP is one of the service providers that can follow these strict service provider requirements
Intersection Upgrade Mascot
Undertake realignment of existing traffic islands, road markings and infrastructure to improve safety of heavy vehicles turning at this intersection.
Highway Upgrade
Realignment of raised median island, drainage and construction of new left turn lane to improve driver and pedestrian safety.
Gordon - Intersection Upgrade
Upgrade of intersection including slip lane and dual right turn lanes to improve safety and increase traffic flow for drivers.